Complex asbestos abatement inside an active VA medical facility

A 15-person team completed more than 14,700 square feet of controlled abatement and demolition across multiple floors in 17 days.

Explore the project ✓ Controlled healthcare environment
Wide view of the asbestos abatement work area inside the VA medical facility
JJ&S asbestos abatement team working inside the controlled healthcare project area
Asbestos abatement professional working inside the controlled project area
Critical
healthcare setting
17 Days to complete
15 Technicians
14,700+ Sq. ft. completed
100% Documented scopes completed

01 / Project overview

High-control work in a sensitive environment.

JJ&S completed a complex asbestos abatement and demolition project at the VA Medical Center’s 4 North Cardiology Cath Lab II in San Diego.

The work extended across third- through fifth-floor areas and required careful containment, sequencing and material handling inside an active healthcare facility. A 15-person team completed more than 14,700 square feet of documented work in 17 days.

02 / The challenge

Multiple floors. Active facility. No room for shortcuts.

The project combined asbestos abatement, selective demolition and detailed cleaning in a sensitive medical environment. Each work area required disciplined controls that supported safe execution while protecting surrounding operations.

✓ Third- through fifth-floor work ✓ Controlled work zones ✓ Active healthcare setting
Protected technician completing asbestos removal inside the healthcare facility
Controlled abatement work within the active healthcare facility.

03 / JJ&S response

Built around control, coordination and documented execution.

JJ&S organized the project around controlled work zones, specialized protection, material-specific procedures and detailed closeout across each phase.

01

Containment planning

Negative-air containment and controlled work zones supported multi-floor activity in a sensitive facility.

02

Protected execution

Specialized worker-protection and access procedures supported safe execution throughout the project.

03

Material management

ACM removal, encapsulation and regulated waste handling were coordinated as part of one controlled process.

04

Documented closeout

HEPA cleaning, final cleaning and clearance coordination prepared each completed area for the next phase.

04 / Delivery at scale

Abatement and demolition across 14,700+ square feet.

The scope brought together material removal, selective demolition, containment, cleaning and disposal across multiple work areas within the medical facility.

  • ✓ Walls, flooring and ceiling systems
  • ✓ Ceiling demolition and ducting removal
  • ✓ ACM removal and encapsulation
  • ✓ HEPA cleaning and controlled waste disposal
↔ 14.7K+ square feet
completed

05 / The outcome

Complex work completed in 17 days.

A 15-person team completed 100% of the documented project scopes across more than 14,700 square feet.

The project demonstrates JJ&S’s ability to coordinate technical abatement and demolition inside an active healthcare setting while maintaining the controls, documentation and schedule discipline the environment required.

Project gallery

View the project gallery
Vertical view of asbestos removal work inside the VA medical facility
JJ&S environmental abatement work inside the controlled healthcare area
Asbestos abatement activity within the multi-floor medical facility project
Controlled asbestos removal inside the active healthcare facility
Asbestos abatement work completed at the San Diego medical facility
VA medical facility asbestos abatement field conditions
Technician working on the San Diego healthcare asbestos project
Asbestos removal field work inside the healthcare facility

Planning abatement work in an active or sensitive facility?

Bring in a team prepared for controlled environments and demanding project conditions.

Talk with our environmental services team ↗